Text size:
A
A
A
home
Home
Home
RIIO ED1 Revised Business Plan
Main Business Plan Documents and Annexes
RIIO-ED1 Commitment Report
All Asset Management Documents
Volume Justification
EPN Justification Documents
LPN Justification Documents
SPN Justification Documents
High Value Projects Justification
Regional Development Plans
EPN RDP Justification Documents
LPN RDP Justification Documents
SPN RDP Justification Documents
Cost Justification and Assurance Documents
Stakeholder Engagement Supporting Documents
Ofgem RIGs Data Tables
Connections quotation
Customer responsibilities
3.1 On-site trenches and cable route
3.2 Ducts
3.3 Services to houses
3.4 Services to flats
3.5 Building Network Operator (BNO) responsibilities
3.6 Unmetered connections
3.7 Temporary builder's connections
3.8 Landlord's connections
3.9 Commercial or industrial connections (400Amps and below)
3.10 Commercial or industrial connections - CT metering large low voltage connections (more than 400Amps)
3.11 Substations: associated with LV connections
3.12 Substations associated with HV and EHV connections
3.13 Substations: primary sites
3.14 Substations: grid sites
3.15 Witness testing
3.16 Primary/grid transformer
3.17 Power Factor
3.18 Active Network Management (ANM) local control requirements for the Flexible Distributed Generation (FDG) quote
3.19 Land rights (time to complete the legal work between Your solicitors and UK Power Networks’ solicitors)
3.20 Land rights required from You (freehold/leasehold of the substation site)
3.21 Land rights required from You (easements for the underground cables)
3.22 Land rights required from You within its occupation, ownership or control (termed wayleave for the underground cables)
3.23 Land rights required from others (property outside the actual site boundary)
3.24 Land rights required from others (agreement in principal from the relevant landowner)
3.25 Construction (Design & Management) Regulations (CDM) 2015
3.26 Appoint an Electricity Supplier
3.27 Works to be undertaken by the ICP/IDNO if UK Power Networks is undertaking the non-contestable Works only
3.28 Land rights for option B or C - where UK Power Networks is undertaking the non-contestable Works only
3.29 Quicker and More Efficient Connections – Queue Management and Connection Milestones
3.30 ENA Industry Queue Management and Connection Milestones
Information to help you plan your works
4.1 Information common to all quotes
4.1.1 About our network
4.1.2 Safety
4.1.3 Matrix of technical information associated with the Works
4.1.4 Prospective Short Circuit Current (PSCC)
4.1.5 The Point of Supply
4.1.6 Supply disturbances
4.1.7 Guaranteed Standards of Performance (GSoP)
4.1.8 Regulatory Information
4.1.9 Contact us
4.1.10 Lane rental charges
4.1.11 Programming your work
4.1.12 Appointing an ICP or IDNO
4.1.13 Assets to be adopted by UK Power Networks
4.1.14 Cable identification by ICPs and IDNOs
4.1.15 Pre and post-connection tests for Low Voltage contestable works
4.1.16 Pre and post-connection tests for High Voltage contestable works
4.1.17 Engineering recommendations G81
4.1.18 Not in Use
4.2 Supply characteristics at the Point of Supply for LV Metered and Un-metered customers
4.3 Supply characteristics for HV and EHV Points of Supply
4.4 Earth Fault Loop Impedance (EFLI)
4.5 Cables between UK Power Networks and Your installations up to 400Amps
4.6 Private generation
4.7 Second Comer Electricity (Connection Charges) Regulations 2002 and 2017
4.8 Basis of Curtailment under the Connection Agreement
4.9 Abnormal network conditions
4.10 Interactive process
4.11 Conditional interactivity applies
4.12 Unconditional interactivity applies
4.13 Calculation of your Connection Charge
EnvReports201617
G81 Documents
Materials Specification
Cables
Documents
Drawings
Earthing
Documents
Drawings
General
Documents
Drawings
Network Operations
Documents
Drawings
Overhead Lines
Documents
Drawings
Planning & Design
Documents
Drawings
Protection & Control
Documents
Drawings
Switchgear
Documents
Drawings
Substations
Documents
Drawings
Transformers
Documents
Drawings
Design & Planning
Cables
Documents
Drawings
Earthing
Documents
Drawings
General
Documents
Drawings
Network Operations
Documents
Drawings
Overhead Lines
Documents
Drawings
Planning & Design
Documents
Drawings
Protection & Control
Documents
Drawings
Switchgear
Documents
Drawings
Substations
Documents
Drawings
Transformers
Documents
Drawings
Installation & Records
Cables
Documents
Drawings
Earthing
Documents
Drawings
General
Documents
Drawings
Network Operations
Documents
Drawings
Overhead Lines
Documents
Drawings
Planning & Design
Documents
Drawings
Protection & Control
Documents
Drawings
Switchgear
Documents
Drawings
Substations
Documents
Drawings
Transformers
Documents
Drawings
Testing & Commissioning
General
Grid & Primary
Secondary
Miscellaneous
Authorisation and Training
Documents for Review
RIIO-2
Main Business Plan Documents and Annexes
RIIO-ED1 Commitment Report
All Asset Management Documents
Volume Justification
EPN Justification Documents
LPN Justification Documents
SPN Justification Documents
High Value Projects Justification
Regional Development Plans
EPN RDP Justification Documents
LPN RDP Justification Documents
SPN RDP Justification Documents
Cost Justification and Assurance Documents
Stakeholder Engagement Supporting Documents
Ofgem RIGs Data Tables
g81
Privacy policy
|
Terms and conditions
|
ukpowernetworks.co.uk
|
Site map