UK Power Networks will require a termed wayleave for the underground cables along the routes marked on the plan provided with the Quote.
The wayleave will require a restriction upon the planting of trees and erection of structures, other than such as already exist or are shown proposed on the relevant plan that will likely cause damage, interference or obstruction for access of any kind to the underground cables. This should be taken into account when carrying out Your landscaping proposal and Your planning permission submission.
UKPN will not be able to proceed if there is a discrepancy between the landscaping plan submitted or any planning conditions regarding the restriction on planting on the termed wayleave.
V2_April 2024