4.1.13 Assets to be adopted by UK Power Networks

UK Power Networks will only adopt assets that are approved for use by and installed to our satisfaction by an ICP with the appropriate NERS accreditation. The assets will need to have been detailed in advance by a Design Submission accepted by UK Power Networks and will be adopted on completion. For an IDNO scheme, UK Power Networks will only adopt assets installed from the Point of Connection to the IDNO boundary and may include any isolation device as determined necessary by UK Power Networks.


UK Power networks will own and maintain these assets once adopted.

V2_April2024