3.6 Unmetered connections

You are responsible for:

Installation 

  • Erecting the installation to facilitate UK Power Networks' connection works, prior to commencement of works.
  • Ensuring all equipment is weatherproof and installed in accordance with the ASLEC Code of Practice.

  • Ensuring the wiring is completed with all fittings and accessories that must comply with the requirements of the Electricity Safety, Quality and Continuity Regulations 2002.

  • Ensuring that prior to the installation of unmetered supplies, either the contractor or the main client will have entered into a Contract for Supply of Electricity, and all other consequential agreements will need to be in place.

 Unmetered Supply Agreement?

  • You are responsible for providing details of new equipment to be connected to the Distribution Network on the Unmetered Connections Form attached to the Quote. This completed form must be returned on acceptance of the Quote.
  • You can return this by email it to: UMSO@ukpowernetworks.co.uk or by post to:
    UMS Agreements Team,
    Energy House,
    Hazelwick Avenue,
    Crawley,
    RH10 1EX

If the completed form is not returned, UK Power Networks reserves the right to insist that the supplies are metered and under these circumstances space provision for metering equipment will need to be made in the supply positions.

 

V1_December2015