3.1 On-site trenches and cable route

You are responsible for (unless explicitly agreed otherwise in writing)

  • The excavation and reinstatement of all trenches and cable routes on-site from Your site boundary as indicated on the proposal plan provided with Your Quote. Please note the arrangement of the trenches and cable routes are also shown on this drawing. Please refer to ECS 02-0019 for the trench arrangements.

V2_April2024