Text size: A A A

4.12 Unconditional interactivity applies

UK Power Networks has received one or more other applications for connections to the same part of its Distribution System. Your application was the first application received.
 
There is insufficient capacity upon UK Power Networks' Distribution System or there are other constraints upon it that will prevent the/all the connection(s) that is/are the subject of the subsequent applications (the “Subsequent Application(s)”) and your connection from being made. Therefore, UK Power Networks is applying its interactive connection application process. UK Power Networks prioritises applications for connections according to their Application Date. In accordance with UK Power Networks interactive connections process the period within which you have to accept this Quote is reduced to 30 days from the date of the Quote.
 
If you wish to proceed with your connection and accept this Quote exactly in accordance with the terms of the Quote you will need to do so by 5pm on the final date acceptance of the Quote. If you fail to do so the Quote will automatically be withdrawn without further reference to you and the capacity may be allocated to one of the Subsequent Applications.

V1_December2015