home
>
Connectionsquotations
>
worksinformation
>
4.1-information-common-to-all-quotes
Home
Connections quotation
Customer responsibilities
3.1 On-site trenches and cable route
3.2 Ducts
3.3 Services to houses
3.4 Services to flats
3.5 Building Network Operator (BNO) responsibilities
3.6 Unmetered connections
3.7 Temporary builder's connections
3.8 Landlord's connections
3.9 Commercial or industrial connections (400Amps and below)
3.10 Commercial or industrial connections - CT metering large low voltage connections (more than 400Amps)
3.11 Substations: associated with LV connections
3.12 Substations associated with HV and EHV connections
3.13 Substations: primary sites
3.14 Substations: grid sites
3.15 Witness testing
3.16 Primary/grid transformer
3.17 Power Factor
3.18 Active Network Management (ANM) local control requirements for the Flexible Distributed Generation (FDG) quote
3.19 Land rights (time to complete the legal work between Your solicitors and UK Power Networks’ solicitors)
3.20 Land rights required from You (freehold/leasehold of the substation site)
3.21 Land rights required from You (easements for the underground cables)
3.22 Land rights required from You within its occupation, ownership or control (termed wayleave for the underground cables)
3.23 Land rights required from others (property outside the actual site boundary)
3.24 Land rights required from others (agreement in principal from the relevant landowner)
3.25 Construction (Design & Management) Regulations (CDM) 2015
3.26 Appoint an Electricity Supplier
3.27 Works to be undertaken by the ICP/IDNO if UK Power Networks is undertaking the non-contestable Works only
3.28 Land rights for option B or C - where UK Power Networks is undertaking the non-contestable Works only
3.29 Quicker and More Efficient Connections – Queue Management and Connection Milestones
3.30 ENA Industry Queue Management and Connection Milestones
Information to help you plan your works
4.1 Information common to all quotes
4.1.1 About our network
4.1.2 Safety
4.1.3 Matrix of technical information associated with the Works
4.1.4 Prospective Short Circuit Current (PSCC)
4.1.5 The Point of Supply
4.1.6 Supply disturbances
4.1.7 Guaranteed Standards of Performance (GSoP)
4.1.8 Standard leaflets and fact sheets
4.1.9 Contact us
4.1.10 Lane rental charges
4.1.11 Programming your work
4.1.12 Appointing an ICP or IDNO
4.1.13 Assets to be adopted by UK Power Networks
4.1.14 Cable identification by ICPs and IDNOs
4.1.15 Pre and post-connection tests for Low Voltage contestable works
4.1.16 Pre and post-connection tests for High Voltage contestable works
4.1.17 Engineering recommendations G81
4.1.18 Parent Company Guarantee Bank Guarantee Form
4.2 Supply characteristics at the Point of Supply for LV Metered and Un-metered customers
4.3 Supply characteristics for HV and EHV Points of Supply
4.4 Earth Fault Loop Impedance (EFLI)
4.5 Cables between UK Power Networks and Your installations up to 400Amps
4.6 Private generation
4.7 Second Comer Electricity (Connection Charges) Regulations 2002 and 2017
4.8 Basis of Curtailment under the Connection Agreement
4.9 Abnormal network conditions
4.10 Interactive process
4.11 Conditional interactivity applies
4.12 Unconditional interactivity applies
4.13 The Voltage Rule
4.1.8 Standard leaflets and fact sheets
Click here to view our Regulatory information.
V1_December2015
Privacy policy
|
Terms and conditions
|
ukpowernetworks.co.uk
|
Site map