It will be necessary for UK Power Networks to obtain rights over property outside the actual site boundary, as indicated on the proposal plan provided with your Quote.
Please note that Works cannot be scheduled in our programme of works until all of the legal work associated with obtaining any required Legal Rights and Consents has been completed.
V1_December2015