Testing and Commissioning

ECP 11-0001 Grid and Primary Installation and Commissioning Requirements

ECP 11-0002 Secondary Commissioning Requirements

ECP 11-0003 Testing and Commissioning Guidance Notes

ECP 11-0006a EHV and HV Cable Insulation Test Form

ECP 11-0006 HV Insulation Testing

ECP 11-0007a Polymeric Cable Sheath Test Form

ECP 11-0007 Polymeric Cable Sheath Testing Procedure

ECP 11-0008a LV Cable Test Form

ECP 11-0008 LV Cable Testing Procedure

ECP 11-0009 Optical Fibre Splicing, Testing, and Commissioning Requirements

ECP 11-0010 BSC Metering Equipment Commissioning Requirements

ECP 11-0011a Two Way LV Link Box Test Form

ECP 11-0011b Four Way LV Link Box Test Form

ECP 11-0011 LV Link Box Testing Procedure

ECP 11-0201a Grid and Primary General Test Form

ECP 11-0201 Grid and Primary Commissioning and Maintenance Test Forms

ECP 11-0202 High Voltage Pressure Test Test Form

ECP 11-0203 Resistance Measurements Test Form

ECP 11-0204 Disconnector - Manually Operated Test Form

ECP 11-0205 Disconnector - Motorised Test Form

ECP 11-0206 Earthing Switch Test Form

ECP 11-0207 Maintenance Earthing Device Test Form

ECP 11-0208 Fault Throwing Switch Test Form

ECP 11-0209 Interlocks Test Form

ECP 11-0210 Circuit Breaker Test Form

ECP 11-0211 Capacitor Voltage Transformer Test Form

ECP 11-0212 Electromagnetic Voltage Transformer Test Form

ECP 11-0213 Transformer (and Reactor) Test Form

ECP 11-0214 Neutral Earthing Resistor Test Form

ECP 11-0215 Surge Diverter Test Form

ECP 11-0216 Substation 400V Switchboard Test Form

ECP 11-0217 General Secondary Wiring and Multicore Cabling Test Form

ECP 11-0218 DC Supplies and Common Services Test Form

ECP 11-0219 DC Operations Test Form

ECP 11-0220 Overall Tripping and Control Test Form

ECP 11-0221 Instrument and Transducer Circuits Test Form

ECP 11-0222 Synchronising Scheme Test Form

ECP 11-0223 Delayed Auto-reclose (including Check Sync) Test Form

ECP 11-0224a Automatic Voltage Control Test Form

ECP 11-0224b Super TAPP Automatic Voltage Control Test Form

ECP 11-0226 Pilot cable test form

ECP 11-0301 Insulation Resistance Test Form

ECP 11-0302 Current Transformer Magnetisation Curve Test Form

ECP 11-0303 Current Transformer Primary Injection Test Form

ECP 11-0304 Current Transformer and Lead Resistance Diagram Test Form

ECP 11-0305 Tripping and Auxiliary Relays Test Form

ECP 11-0306 IDMT, Instantaneous and Directional Overcurrent and Earth Fault Protection Test Form

ECP 11-0307 High Impedance Earth Fault (REF) Protection Test Form

ECP 11-0308 DUOBIAS Biased Differential Transformer Protection Test Form

ECP 11-0309 Circulating Current Protection Test Form

ECP 11-0310 High Impedance Differential Busbar Protection Test Form

ECP 11-0311a SOLKOR R and RF Feeder Unit Protection Test Form

ECP 11-0311b SOLKOR N Feeder Unit Protection Test Form

ECP 11-0311c TRANSLAY S Feeder Unit Protection Test Form

ECP 11-0313 Pilot Supervision Test Form

ECP 11-0315 G59 Test Form

ECP 11-0401 Telecontrol and Functional Test Form

ECP 11-0402 Scheme Functional Checks Test Form

ECP 11-0403 Pre-energisation Checks Test Form

ECP 11-0404 Post-energisation Checks Test Form

ECP 11-0406 Earthing System Test Form

ECP 11-0501a Secondary Substation Commissioning Form

ECP 11-0501 Secondary Commissioning Procedures

ECP 11-0503a Earthing Test Form

ECP 11-0503 Earthing Commissioning Procedure

ECP 11-0504 Secondary Substation Energisation Procedure

ECP 11-0506a Distribution Transformer Test Form

ECP 11-0506b Pole-mounted Transformer Test Form

ECP 11-0506 Distribution Transformer Commissioning Procedure

ECP 11-0507a Compact and Micro Substation Test Form

ECP 11-0507 Compact and Micro Substation Commissioning Procedure

ECP 11-0511a Schneider RN2, RN2c and RE2c Test Form

ECP 11-0511b Schneider SE6 Test Form

ECP 11-0511c Schneider CN2 and CE2 Test Form

ECP 11-0511d Lucy SCRMU, VRN, VRN2 Test Form

ECP 11-0511e Lucy VRN2a and VRE2a Test Form

ECP 11-0511f Lucy SSEa Test Form

ECP 11-0511g Lucy VCN2a and VCE2a Test Form

ECP 11-0511 Ground-mounted Switchgear Commissioning Procedure

ECP 11-0511h Efacec Fluofix GCT Test Form

ECP 11-0511i Schneider RN2c and RE2c 2016 Test Form

ECP 11-0511z Efacec Fluofix GCT SCADA Interface Drawings

ECP 11-0511z Efacec Fluofix GCT Schematic Drawings

ECP 11-0511z Lucy SABRE A Schematic Drawings

ECP 11-0512c Schneider RN2, RN6, RN2c and RN6c with Vip 300 Relay Test Form

ECP 11-0512d Schneider CE6 with Vip 300 Relay Test Form

ECP 11-0512f Lucy VRN6a with MiCOM P124S RelayTest Form

ECP 11-0512g Lucy VRN6a with Argus 7SR11 Relay Test Form

ECP 11-0512 Ground-mounted Switchgear with Protection Relays Commissioning Procedure

ECP 11-0512h Lucy VCE6a with Argus 7SR11 Relay Test Form

ECP 11-0512i Schneider RN6c with MICOM P116 Relay Test Form

ECP 11-0512j Schneider CE6 with Sepam 1000+ Relay Test Form

ECP 11-0514a ACB Test Form

ECP 11-0514 ACB Commissioning Procedure

ECP 11-0515a Lucy HV Air Metering Unit 3 Limb Test Form.docx

ECP 11-0515b Lucy HV Air Metering Unit 5 Limb Test Form.docx

ECP 11-0515c Schneider HV Metering Unit 3 Limb Test Form.docx

ECP 11-0515d Schneider HV Metering Unit with Open Delta 5 Limb Test Form.docx

ECP 11-0515e Generic Metering Panel Test Form.docx

ECP 11-0515 HV Metering Equipment Commissioning Procedure

ECP 11-0516a LV Cabinet-LV Board Metering Equipment Test Form.docx

ECP 11-0516b LV Cut-out Metering Equipment Test Form.docx

ECP 11-0516 LV Metering Equipment Commissioning Procedure

ECP 11-0521a Nortroll CableTroll 2350 FPI Overcurrent/Earth Fault Test Form

ECP 11-0521b Nortroll CableTroll 2350 FPI Earth Fault Only Test Form

ECP 11-0521 Nortroll CableTroll 2350 FPI Installation and Commissioning Procedure

ECP 11-0529a PLTU Test Form

ECP 11-0529b Logic PLTU Test Form

ECP 11-0529 PLTU Commissioning Procedure

ECP 11-0532a Schneider T200E Control Unit and RTU Test Form

ECP 11-0532b Schneider T200E Control Unit and RTU ENMAC Commissioning Form

ECP 11-0532 Schneider T200E (Talus 200) Control Unit and RTU Commissioning Procedure

ECP 11-0601 GPRS/3G/4G Comms Device Configuration and Commissioning Procedure

ECP 11-0651a ION7650 Power Quality Meter Test Form

ECP 11-0651 ION7650 Power Quality Meter Commissioning Procedure