ECP 05-9535 Remsdaq Callisto 1 Control Unit and RTU Installation Procedure

ECS 02-0011 11kV Jointing Manual

ECS 02-0019 Installation of Underground Cables - LV to 132kV

ECS 02-0031 Installation of Power Cables and Joints in Air

ECS 02-0033 33kV Jointing Manual

ECS 02-0037.1 600A Service for 300-400mm Stranded Copper

ECS 02-0037.2 800A Service for 185mm Bunched Wave Form

ECS 02-0037.3 800A Service for 300-400mm Stranded Copper

ECS 02-0037.4 800A Service for 740mm Sectorial Aluminium

ECS 02-0037.5 800A Service for 630mm Stranded Copper

ECS 02-0037.6 800A Service for 300mm parallel waveform

ECS 02-0037 Installation of Service Ways and Cables (Schneider Electric)

ECS 02-0065 Installation of Plastic Resin Filled Joint Shells Around Existing LV Lead Sleeve T Joints

ECS 02-0066 Underground Optical Fibre Installation

ECS 02-0067 Pot Ending LV SWA Service Cables

ECS 03-0019 Access and mounting space for street furniture cut-outs

ECS 03-0022 Installing Genie Evo 12kV Extensible Switchpanels

ECS 03-0037 Non-Standard Installation of LV cables to ACB's on the LPN Network

ECS 03-0054 Connection of Large LV Services to Secondary Distribution Substations

ECS 05-9540 Type E RTU and Ancillary Items Installation Procedure

ECS 05-9541 Lucy Gemini 3 Configuration Procedure

ECS 05-9542 Remsdaq Callisto NX Configuration Procedure

ECS 06-0022 Grid and Primary Earthing Construction

ECS 06-0023 Secondary Distribution Network Earthing Construction Standard

ECS 06-0024 Earthing Testing and Measurements

ECS 13-0080 Combined Cut-Out and CT Chamber Installation

ECS 13-0087 Installation, Testing and Commissioning of LV Boards

EDS 09-0019 Safety Sign and Identification Labelling of Equipment

EOP 02-0058 Use of Guroflex in Existing Bitumen Compound or G38 Filled Cable Boxes containing PILC cable

EOS 01-0014 Temporary Shrouding for Third Parties Working in the Vicinity of LV Overhead Lines

EOS 03-0006 Air Metering Unit Design Modification

EOS 03-0018 Schneider Ringmaster 'C' Range Switchgear

EOS 03-0027 Lucy Sabre 'A' Range Switchgear

EOS 03-0049 Hawker Siddeley Switchgear Eclipse - Actuator Fuse

EOS 03-0058 Acrastyle 145kV Disconnectors - Ice Shield Defect

EOS 03-0072 Pup Busbar for WT Henley Cut-Outs

EOS 05-9305 Lucy Gemini 3 Type E RTU

EOS 05-9306 Remsdaq Callisto NX Type E RTU

LV Jointing Manual Index

LV Jointing Manual Section 1&2 (27 mb)

LV Jointing Manual Section 3

LV Jointing Manual Section 4

LV Jointing Manual Section 5

OHL Construction Manual Section 1. 2015

OHL Construction Manual Section 5. 2015

OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) LV Mains and Services

Overhead Craft Manual Section 01. 2015

Overhead Craft Manual Section 02. 2015

Overhead Craft Manual Section 03. 2015

Overhead Craft Manual Section 06. 2015

Overhead Craft Manual Section 10. 2015